WRTI Feasibility Study

Builder's Civil & Structural Works

Feasibility Study for the Establishment of the Wildlife Training and Research Institute (WRTI)

Kenya

2022

Feasibility study, architectural and engineering concept designs, and cost estimation for the proposed WRTI institutions.

Client: Wildlife Training and Research Institute Value: KES 3.6 Billion Status: Completed

The Great Jubilee Mall

Builder's Civil & Structural Works

The Great Jubilee Mall, Karen Nairobi

Karen, Nairobi

2016-2018

Structural and civil works consultancy services for a 52,688 sqm mall with 1,418 parking bays.

Client: Kenya Conference of Catholic Bishops Value: KES 1.62 Billion Status: Completed

Kakamega County Hospital

Builder's Civil & Structural Works

Kakamega County Teaching and Referral Hospital

Kakamega County

Completed

Structural and civil engineering drawings for a four-floor, 550-bed hospital with an estimated total floor area of 640,000 sqm.

Client: Kakamega County Value: KES 6.3 Billion Status: Completed

Northgate Mall

Builder's Civil & Structural Works

Northgate Mall, Utawala Nairobi

Utawala, Nairobi

2016

Structural and civil engineering drawings for a four-storey commercial building.

Client: Bitper Enterprises Value: KES 600 Million Status: Completed

Falcon Heights Apartments

Builder's Civil & Structural Works

Falcon Heights Residential Apartments

Racecourse, Ngong Road, Nairobi

Completed

Detailed civil and structural designs for residential apartments with a basement and thirteen floors.

Scope: Civil & Structural Design Value: KES 800 Million Status: Completed

Uthiru Pearls Apartments

Builder's Civil & Structural Works

Uthiru Pearls Residential Apartments

Waiyaki Way, Nairobi

Completed

Civil and structural drawings for three apartment blocks developed by Manguo Enterprises.

Client: Manguo Enterprises Value: KES 1.2 Billion Status: Completed

Kiambu Housing Phases 1 & 2

Builder's Civil & Structural Works

Kiambu Housing / Eden Ville Development

Kiambu Road, Kenya

2010-2018

Civil and structural designs and works supervision for Eden Ville, a phased gated residential development including 350 two- and three-bedroom houses.

Client: Hass Consult / Kiambu Housing Value: KES 30 Billion Status: Completed

Mombasa & Kisumu Commuter Rail

Transportation

Feasibility Study for Commuter Railway Transportation for Mombasa and Kisumu Cities

Mombasa and Kisumu Cities

2012

Feasibility assessment for an extensive commuter railway system for Kenya's two largest cities after Nairobi, delivered as sub-consultants to Poyry Energy.

Client: Kenya Railways Corporation Role: Sub-consultant Status: Completed

Nairobi Outering Road

Transportation

Nairobi Outering Road (C59)

Nairobi County

Completed

Works supervision support for the 13 km Outering Road improvement connecting the Eastern Bypass at Taj Mall to GSU at Baba Dogo on Thika Road.

Partner: Lea Associates Role: Sub-consultant Status: Completed

Lang'ata Road Expansion

Transportation

Lang'ata Road Expansion

KWS Junction to Bomas of Kenya

Completed

Works supervision support for expansion of Lang'ata Road to a dual carriageway, helping reduce peak-hour traffic on Magadi Road.

Partner: APEC Consortium Role: Sub-consultant Status: Completed

Traffic Microsimulation

Transportation

Traffic Impact Study for Green Park Matatu Terminus

Nairobi County

2022

Traffic impact study using Paramics Discovery 25.0.2 and AnyLogic 8.7.10 for vehicular and pedestrian traffic simulations.

Client: Kenya Urban Roads Authority Scope: Traffic Microsimulation Status: Completed

Kwanza Water Supply

Water & Sanitation

Kwanza Water Supply Project

Trans Nzoia County

2015-2019

Water works consultancy under the World Bank-supported Water and Sanitation Services Improvement Project - Additional Financing.

Client: LVNWWDA Value: KES 95 Million Status: Completed

Kapenguria Water Supply

Water & Sanitation

Rehabilitation of Kapenguria Water Supply

Kapenguria and Makutano Towns

2019

Design and supervision for rehabilitation of Kapenguria and Makutano towns water supply systems under the WaSSIP-AF programme.

Client: RVWWDA / LVNWWDA Value: KES 58 Million Status: Completed

Karagita Settlement Water Supply

Water & Sanitation

Karagita Settlement Water Supply Expansion

Naivasha, Nakuru County

KISIP II

Design and implementation supervision for settlement water supply expansion, including a 40 m3/hr reverse osmosis de-fluoridation unit and 7,800 m of HDPE pipeline.

Client: Nakuru County / KISIP II Scope: Water Supply Expansion Status: Completed

Kapcherop Water Supply

Water & Sanitation

Kapcherop Indigenous People Water Supply Scheme

Kapcherop, Kenya

2014-2017

Feasibility study, preliminary and detailed design, and supervision of works for the Kapcherop Indigenous People water supply scheme.

Client: Lake Victoria North Water Services Board Value: KES 114 Million Status: Completed